6 August 2019
A documented firewood purchase.
UKC’s contract register lists a contract dated 6 August 2019 for firewood in the 2019/2020 season, for the boiler house at the Psychiatry Clinic location.
Editorial summary
The register, current as of 15 September 2020, lists a contract value of BAM 87,546.42 including VAT.
The fuel purchase documents supply in that season. It does not establish the plant’s construction year or the composition of fuel used later.
The event date is the contract date; the source register was published in 2020.
Check for yourself
This entry’s sources
Source titles retain their original form. Quotations on the Cyrillic site are transliterated without changing the wording; the original is linked at the source. Reprints of the same story are not independent confirmations.
Item 79: firewood for the 2019/2020 season, contract 01-5804-9/19 of 6 August 2019. A fuel purchase does not confirm the boiler house’s construction year.
Content checked: 20 October 2026Have an addition or correction?
Send a source and identify the part of the entry it concerns. We publish verifiable additions and institutional responses alongside the event.
Suggest a correction