Šobot tell CAPITAL say dem order relocation of old boiler house because polluting particles increase. The same report carry inspection finding say dem build the new one without construction permit and order removal of the work.
ATV report say patient escape from the Clinic, enter Vrbas and come out with police assistance. Dem take the person to emergency care; the article report no physical injuries.
Nezavisne novine carry UKC notice say Oncology Clinic go begin patient care for Paprikovac on 23 March. Dem publish the article three days before the announced start.
BL Portal report discussion about possible school for the present location and Šobot statement say dem dey wait for credit procedures for new psychiatry facilities. The article no announce specific construction start.
For interview, Nikola Šobot discuss new oncology and haematology building and planned patient relocation. E announce organisational changes and better working conditions.
City of Banja Luka say dem dey implement long-term plan from 2022, monitor air quality and prepare emissions-source map. Dem say short-term plan dey wait for relevant ministry approval.
Pulmonologist and former UKC director Mirko Stanetić describe sharp increase in lung-cancer patients and warn about winter smog. We link the interview with air-pollution reports from 2023 and 2025.
BiH Council of Ministers adopt draft framework loan agreement of €11,135,000 for six psychiatric institutions. Dem plan €7,669,464 for four institutions in RS.
SRNA, wey Srpskainfo republish, record opening of the first 560 parking spaces and Đajić announcement of new psychiatry facilities, medical faculty and school.
UKC announce cooperation with Chinese and French delegations on training and equipment procurement for cardiac surgery, wey Nikola Šobot head that time. We ask about public investment criteria and psychiatry place among priorities.
FENA carry Ministry response about accepting borrowing for four Republika Srpska (RS) institutions and prioritising new Clinic for Paprikovac. The Ministry say e still too early to give deadlines.
N1 carry UKC statement: one patient get burns, while dem keep five employees under observation because of smoke exposure. Staff and firefighters contain the fire.
On World Mental Health Day, Đajić discuss plan and concept design for Paprikovac and expect funding agreement soon. The Clinic head stress need to prevent stigma against patients.
Faktor magazin carry Slobodan Hajder announcement say tender for new Clinic building for Paprikovac go soon come, with funding and documents wey e describe as practically secured.
N1 report say dem still dey prepare documents to resolve accommodation needs. Former minister Slobodan Stanić warn about risks wey e associate with the buildings’ physical condition.
Srpskainfo report say Slobodan Stanić show Clinic pictures for press conference and criticise conditions for patients and staff, while e propose different allocation of public investment.
Nezavisne report say dem question citizen from Čelinac and escort the person to psychiatry after request to meet mayor and report of behaviour wey frighten staff. According to police statement, prosecutor find no elements of criminal offence for that incident.
Alongside ombudsman warnings about damp and poor accommodation, Srpskainfo carry UKC response: dem renovate boiler house and put am into operation with new boiler before that heating season.
After reports say court annul Stanetić 2017 dismissal, CAPITAL report for January 2018 say Government issue new dismissal decision and reappoint Đajić as acting director.
Jug 1 drawing, dated August 2017, show residential and commercial buildings and university expansion zone. The drawing wey we review no separately identify new psychiatry clinic.
Another report record insulation, damp and equipment problems. UKC say dem handle urgent repairs within their budget and staff continue to provide healthcare.
BUKA report Mirko Stanetić dismissal and Vlado Đajić appointment as acting UKC director. Both say that time say dem still dey wait for formal decisions.
RTRS report Radojičić statement say both the City and Clinical Centre claim the land wey Surgery and Psychiatry occupy, and future regulatory plans matter.
Report wey republish ATV story present new clinic as solution wey dem expect in three years. Staff describe how dem dey maintain dilapidated rooms and lack necessary facilities.
Banjaluka.net carry report about damp and deterioration for parts of the complex. The Ministry and UKC acknowledge the problem and describe earlier renovations and efforts to get assistance.
For interview wey eKapija republish, Stanetić describe new UKC facilities but say conditions never complete to relocate every service, including Psychiatry.
During visit to Jakeš institution, Minister Ranko Škrbić also announce psychiatric clinic building for Banja Luka. The article give no deadline for that building.
Glas Srpske report say dem don select designers and expect design work to finish by month-end. Director-general Mirko Stanetić identify Paprikovac as the location wey dem plan.
Blic report say one third of around 120 patients dey receive treatment for dilapidated barracks. Better conditions depend on possible loan arrangement and new building.
Glas Srpske describe the day hospital dilapidated building. The head that time explain say dem don renovate or newly build much of the Clinic, while this building still dey wait.
For interview with Nezavisne, Minister Ranko Škrbić say design don complete and announce say construction of four buildings for Clinic relocation suppose start soon.
Nezavisne novine record new and renovated buildings, alongside two inadequate barracks for the Banja Luka Clinic. The deputy head describe earlier roof leaks and deterioration.
Glas Srpske report opening of prefabricated building and Škrbić announcement of funding for clinic for Paprikovac. Director Milan Skrobić separate improved accommodation from permanent solution.
According to Blic retrospective report from 2010, dem build the barracks for Obilićevo after the 1969 earthquake. Later, dem treat Psychiatry Clinic patients for some of those buildings.
One article for January 2019 report say dem renovate the boiler house before that heating season. Exact work dates, emissions measurements, final appeal result and claims say dem divert funds still remain open questions. Documents wey never dey available remain research questions. This archive no claim say e don find every publication wey exist. Suggest one source ↗
We read report of Đajić allegation and announced search for proof. Article no establish electoral fraud; e cite preliminary result. Final figures and later outcome of his allegation never confirm.
We read article and metadata: dem publish am on 27 September 2022 and update am on 23 May 2024. This record use Traljić account of Đajić campaign speech for Čelinac concert; we no treat am as finding by court or Central Election Commission.
The report, wey dem publish at 21:03, relay Đajić statement postponing concert wey dem schedule for 4 September 2026. Headline say cancelled; body say postponed. This report confirm neither new date nor say concert take place.
The report and Đajić posts wey dem relay describe thousands of attendees and another gathering. This no be political popularity survey or evidence say e be Čelinac most popular public figure.
For the feature, Đajić describe growing up and going school for Branešci, Čelinac municipality. That biographical fact no establish involvement in anybody referral to psychiatry.
Author / byline: Odjeljenje za komunalne poslove / Grad Banja Luka
The statement describe plans, monitoring and institutional responsibilities when dem publish am. This source no establish later approval or measured effects.
Institutional directory of data, archives and monitoring links. We no reproduce current measurement series here, and we no establish any individual emitter contribution.
Author / byline: International Agency for Research on Cancer
General scientific background: dem classify outdoor air pollution as carcinogenic to humans. The source no establish the Clinic boiler house contribution to exposure or disease for Banja Luka.
We visually review the full drawing, sheet 04 at scale 1:1000, dated August 2017. The 2025/03 upload folder no be adoption date. Drawing alone no establish current legal validity, ownership or construction legality.
The register list original Jug 1 plan and amendments 060a and 060b. Review of this index no be full legal review of all amendments and how dem apply to individual parcels.
Author / byline: Prenos obavještenja Grada Banja Luka
E describe public viewing of Jug 1 draft from 26 April to 26 May 2017, for the area between Majke Jugovića, Bulevar vojvode Stepe Stepanovića, Mačvanska and Vrbas. Public viewing no be adoption decision.
We read republication of CAPITAL article. The original block automated access. We never directly review inspection order; we attribute findings and appeal to the outlet.
We read Đajić response: e defend the jokes and claim say delegations praise am. His account of visitors’ reaction no be independent statement from the visitors themselves.
We read the article wey relay Banja Luka Police Administration statement. URL and image description retain earlier headline about threats; visible headline refer to staff wey frightened. No medical decision or later outcome dey published. We omit the individual identity.
Author / byline: Narodna skupština Republike Srpske
We read attached original 2020 text, especially Articles 29–33 on medical assessment, consent and detention. E provide framework to separate procedures, no be proof of how dem apply am for this case or complete review of laws wey dey in force for 2026.
UKC response describe boiler house renovation before that heating season, new boiler and commissioning. Article date no confirm say dem do the work inside 2019 itself.
Content wey we check: 20 Ọktóba 2026
Institucija ombudsmena za ljudska prava BiHDate never confirm
Author / byline: Institucija ombudsmena za ljudska prava BiH
The report date na February 2018, with no exact publication day. Banja Luka dey for pages 62–64; annex on page 96 date the visit to 7 November 2016. We link direct public document without copying photographs.
Article of 12 June 2024 describe conduct during visit of 7 May 2024. We attribute assessment of impropriety to the outlet. Đajić response wey dem publish on 14 June dey linked; we no reproduce video or photographs.
E republish credit-financing story. The claim of five injured patients and one doctor different from UKC statement of 8 January 2024; we use the first statement for figures.
We review direct HTML page. Relevant paragraph concern Surgery and Psychiatry land and regulatory plans; city heating utility for headline no be the Clinic boiler house.
We review original interview directly. This record use section about new Clinic; minister statement say design don complete no confirm say construction don begin.
We read republication of the Nezavisne interview for browser. Boiler-house reference elsewhere for the interview no identify Psychiatry plant, and we no use am as evidence of work on that plant.
We read the article for browser after security page finish automatically. Dem publish am for January 2018 and e describe renewed dismissal for December 2017; we no treat the relative words “this year” as new dismissal date.
We read written interview for browser. Alongside the increase in patient numbers, the speaker discuss smoking, winter smog and early detection. E also say better diagnosis partly contribute to the increase wey e observe. E no be incidence register or finding about one boiler house.
We check channel, title, description and date for YouTube. We use the same publisher public written interview for exact quotation; we no download or embed the video.
Na only ministerial term, 14 March–5 September 2013, we use from his own CV, p. 1. We no reproduce private contact details. Document publication date never confirm.
We read official announcement of 7 May 2024. E identify cardiac-surgery cooperation and procurement as objectives and state Šobot role that time; e no publish contract, price or proof of equipment delivery.
Institutional announcement about handover of design documents and completion of preparatory phase for four institutions. E no confirm construction start or represent direct review of all technical annexes.
The article give IQAir index values of 198 and 207 that time. Na dated index snapshots, no be current measurements, annual average or concentrations in µg/m³.
Dem publish am on 18 December 2025 at 20:18, reporting index of 479 at 19:00. We no present the index as annual level, mass concentration or current conditions.
Na commentary with named author alongside PurpleAir data. Assessment of authorities’ response remain the author views; network coverage and snapshot time limit the rankings.
We review official publication overview about emissions from wood and coal heating. Na general background for heating choices, no be technical inspection, measurement or ranking of the Clinic specific boilers.